Renovation and new homes in Van Alstyne.

Van Alstyne has the most mixed housing in our area: frame houses from before 1950, streets from the 1960s to the 1990s, and new subdivisions along US 75. We renovate the oldest, remodel the middle years and build new on combined original-town lots.

Hands guiding a hand plane across a board, with chisels and curled shavings on the bench

Reference image · Hand plane and wood shavings

Introduction

Van Alstyne’s original town lots are about 25 feet wide. The city prefers a house to sit on two.

Van Alstyne exists because the Houston and Texas Central Railway bypassed Mantua in 1872. Mantua’s settlers moved to the new townsite, the post office opened in 1873 and the town incorporated in 1890. The Cartwright House, built around 1890 and moved across town on log rollers pulled by mules about 1901, now holds the city’s historical museum on North Waco Street.

That long history left a real stock of old houses. About one home in six predates 1950, more than a third are over 35 years old, and 44 percent were built since 2010. The population grew slowly for a century, from about 1,940 around 1900 to 3,046 in 2010, then reached an estimated 8,012 in 2025. Renovation and new construction now go on side by side in the same small city.

At a glance

Map of Van Alstyne and our McKinney studioVan Alstyne is 17.6 miles northeast of our studio, inside our 20-mile service area.
Van Alstyne, its city limits shaded, and our studio in west McKinney

Van Alstyne at a glance.

Van Alstyne lies northeast of our studio, up US 75 beyond Anna.

From our studio
17.6 miles northeast of our studio (about 22 miles by road)
County
Grayson and Collin counties
ZIP codes
75495
School districts
Van Alstyne ISD
Population
4,369 (2020 Census)

What we do here

Old and new in Van Alstyne.

The same five kinds of work, shaped by a town whose houses span more than a century.

  1. Custom Homes

    Infill homes in the original town, where the overlay prefers a 50-foot site made of two 25-foot lots, and new homes on acreage at the rural edges, all designed to the codes in effect since October 1, 2026.

  2. Remodeling

    Kitchen, bath and layout changes in the houses of the 1960s to the 1990s, about a quarter of the town. Moving or repairing walls, floors, ceilings, windows or doors counts as structural work here, so each change is permitted.

  3. Renovation

    The pre-1950 frame houses of the original town: pier-and-beam foundations leveled, wiring and plumbing brought up to date, and porches and windows repaired. Few nearby towns have as many houses of this age.

  4. Kitchens & Baths

    Kitchens and baths rebuilt in houses from before the Second World War to the 2010s. In Van Alstyne, plumbing, electrical and mechanical work, water heater replacement included, all goes through a city permit.

  5. Outdoor Living

    Covered patios, decks, pergolas and pools for the newer subdivisions, and porches repaired on the older houses. Decks and patio covers need a permit, and so does adding or removing an accessory building.

What to know

Van Alstyne’s rules: what to know first.

Van Alstyne lists no permit exemptions and asks owners to call before starting work. These are the rules that shape most projects.

From the City of Van Alstyne

  1. What needs a permit

    New construction, alterations and additions; structural changes, including moving or repairing walls, floors, ceilings, windows or doors; decks and patio covers; fence changes; garage conversions; accessory buildings; roofs; plumbing, electrical and mechanical work; sprinklers, generators, solar and demolition. The city lists no exemptions.

    City of Van Alstyne: permits

  2. The codes in effect since October 2026

    On October 1, 2026, Van Alstyne moved to the 2021 editions of the International Residential, Building, Energy Conservation, Existing Building, Fire, Plumbing, Mechanical, Fuel Gas, Property Maintenance and Swimming Pool and Spa Codes, adopted with the regional amendments of the North Central Texas Council of Governments.

    City of Van Alstyne: permits

  3. Plan review and inspections

    Plans are submitted by email, and initial review takes five to seven business days. Bureau Veritas handles plan review and inspections for the city; inspections requested by 3 p.m. on a weekday happen the next business day.

    City of Van Alstyne: permits

  4. Registered contractors

    All contractors working within Van Alstyne’s jurisdiction must be registered with the city, and the permit office asks to hear from owners before any work begins. We prepare the drawings and applications for every project as part of design.

    City of Van Alstyne: permits

  5. The original town overlay

    The Original Town Residential District Overlay covers the old core, where platted lots are only about 25 feet wide. The city’s preferred minimum building site is 50 feet, two original lots combined, which shapes where an infill house can go and how wide it can be.

    City of Van Alstyne: zoning

  6. Two electric providers

    The city lists two electric providers: Grayson-Collin Electric Cooperative, organized in 1937 and headquartered in Van Alstyne, and Oncor. For a new home or a new service, we confirm which one serves the lot early, since its connection steps set part of the schedule.

    City of Van Alstyne: electric providers

  7. Old foundations, clay ground

    Many of the older houses sit on pier-and-beam foundations over clay that swells and shrinks with the seasons. Leveling, new piers and better drainage often come before any finish work, so that new floors and doors stay true.

Neighborhoods

Van Alstyne, from oldest to newest.

With no single era in charge, the town’s parts are most easily told apart by age.

The original town
Narrow-lot streets around downtown and Dorothy Fielder Park, under the OTRD overlay, with frame houses from the 1870s to the 1950s. Restoration, foundation leveling, new systems, and infill homes on combined lots.
Streets of the 1960s to the 1990s
About a quarter of the town’s homes, now due for new kitchens, baths, windows and insulation, and for layouts opened to the way people live now.
Houses of the 2000s
One home in seven, built in the decade before the US 75 growth reached town. At twenty or so, they want kitchens, baths, flooring and a first covered patio.
New subdivisions along US 75
Some 44 percent of homes, built since 2010 as growth arrived along US 75. Covered patios, pergolas, pools and the first interior upgrades.
Rural edges
Acreage around the town, where additions and new homes have room to spread out, and a shop or garage can sit well apart from the house.

VI  ·  How it unfolds

From the first visit in Van Alstyne to the keys.

  1. 01

    Consultation

    We meet at your home or lot in Van Alstyne, or at our McKinney studio, and talk through the brief, the timing and a budget range.

  2. 02

    Design

    Plans, structure and selections resolved in full, with the scope and price agreed, before work begins.

  3. 03

    Approvals

    Permits from the City of Van Alstyne and any HOA architectural review, prepared, submitted and followed through.

  4. 04

    Build and handover

    One managed schedule, regular site walks and plain updates, then a careful walkthrough and every punch-list item closed.

View the full process

Questions

Building in Van Alstyne: questions.

Do I need a permit to replace windows in Van Alstyne?

Plan on one. The city’s permit list includes structural changes, among them moving or repairing walls, floors, ceilings, windows or doors, and it lists no exemptions. Call Development Services before starting; on our projects we apply for the permit with the drawings.

Can I build a new house on an original-town lot in Van Alstyne?

Usually on two. Original-town lots are about 25 feet wide, and the city’s preferred minimum building site in the OTRD overlay is 50 feet, two lots combined. We check the lots, setbacks and overlay rules before design.

Which building codes apply in Van Alstyne now?

The 2021 International codes with the regional amendments, effective October 1, 2026. Bureau Veritas reviews plans and inspects work for the city, and plans go in by email, with initial review taking five to seven business days.

Do you restore old houses in Van Alstyne?

Yes. About one home in six here was built before 1950. We level pier-and-beam foundations, update wiring and plumbing, and repair porches and windows, keeping the character of the house while making it sound.

Who supplies electricity in Van Alstyne?

The city lists two providers: Grayson-Collin Electric Cooperative, which is headquartered in Van Alstyne, and Oncor. Which one serves your address matters for a new home or a new service, so we confirm it early.

Lux Domus Builder

Begin with a conversation in Van Alstyne.

A private consultation is the first step of every project, whether you are planning a new home, reshaping the one you have or bringing it up to date.

Headquartered in McKinney, Texas (214) 892 5228 [email protected]